WILLIAMS CONSTRUCTION & CABINETRY, INC. - PROJECT TN ERFO FS CHRKE804 2020-2(4): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON LITTLE GASSAWAY ROAD (FS 45) AND SINA BRANCH ROAD (FS 67). PROJECT WORK INCLUDES GRADING, ROADWAY RESURFACING, DRAIN DIP CONSTRUCTION, REPLACEMENT O
Key Details
Description
PROJECT TN ERFO FS CHRKE804 2020-2(4): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON LITTLE GASSAWAY ROAD (FS 45) AND SINA BRANCH ROAD (FS 67). PROJECT WORK INCLUDES GRADING, ROADWAY RESURFACING, DRAIN DIP CONSTRUCTION, REPLACEMENT O
Context & Analysis
On Jun 17, 2026, Department of Transportation obligated $6,435,688.9 to WILLIAMS CONSTRUCTION & CABINETRY, INC. for project tn erfo fs chrke804 2020-2(4): the project consists of repairing storm and flood damage on little gassaway road (fs 45) and sina branch road (fs 67). project work includes grading, roadway re…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in OLD FORT, TN. The contract is scheduled through Jan 23, 2029. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M