This contract expires in 398 days (Oct 15, 2027).
YORKSHIRE INDUSTRIES LLC - NC NP BLRI 5140-091P: THE PROJECT CONSISTS OF THE REHABILITATION OF U.S. 421 BRIDGE AT DEEP GAP. THE WORK INCLUDES REPAIR OF CONCRETE, CONCRETE CRACK REPAIR, CLEAN AND RESEAL JOINTS, REPOINT STONE MASONRY, REMOVAL OF CONCRETE PAVEMENT (MICRO MILLI
Key Details
Description
NC NP BLRI 5140-091P: THE PROJECT CONSISTS OF THE REHABILITATION OF U.S. 421 BRIDGE AT DEEP GAP. THE WORK INCLUDES REPAIR OF CONCRETE, CONCRETE CRACK REPAIR, CLEAN AND RESEAL JOINTS, REPOINT STONE MASONRY, REMOVAL OF CONCRETE PAVEMENT (MICRO MILLI
Context & Analysis
On Mar 12, 2026, Department of Transportation obligated $1,831,386.02 to YORKSHIRE INDUSTRIES LLC for nc np blri 5140-091p: the project consists of the rehabilitation of u.s. 421 bridge at deep gap. the work includes repair of concrete, concrete crack repair, clean and reseal joints, repoint stone ma…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in BOONE, NC. The contract is scheduled through Oct 15, 2027 — approximately 13 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
Stay Updated
Get notified about new opportunities matching your interests.