This contract expires in 99 days (Jan 31, 2027).
ZACH DAVIDSON EXCAVATION LLC - THE EXISTING PIPING AND CONTROL STRUCTURE AT BEAVER LAKE HAVE FAILED RESULTING IN THE WATER SURFACE ELEVATION DROPPING ALMOST 7-FT. EXISTING CORRUGATED METAL PIPING WILL BE REPLACED WITH REINFORCED CONCRETE PIPING. NEW FILTER DRAIN, PLUNGE POOL, AND
Key Details
Description
THE EXISTING PIPING AND CONTROL STRUCTURE AT BEAVER LAKE HAVE FAILED RESULTING IN THE WATER SURFACE ELEVATION DROPPING ALMOST 7-FT. EXISTING CORRUGATED METAL PIPING WILL BE REPLACED WITH REINFORCED CONCRETE PIPING. NEW FILTER DRAIN, PLUNGE POOL, AND
Context & Analysis
On Aug 14, 2026, Department of Agriculture obligated $353,000 to ZACH DAVIDSON EXCAVATION LLC for the existing piping and control structure at beaver lake have failed resulting in the water surface elevation dropping almost 7-ft. existing corrugated metal piping will be replaced with reinforced co…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Competition extent: competed under sap with 5 offers received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in ROLLA, MO. The contract is scheduled through Jan 31, 2027 — approximately 3 months remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M
UNAKA ROAD REPAIRS FROM HURRICANE HELENE. REPLACEMENT OR REPAIR OF 22 MILES OF ROAD.
WILLIAMS CONSTRUCTION & CABINETRY, INC.
$7.5M
Stay Updated
Get notified about new opportunities matching your interests.