USCG/CG-C5I8(a)$500K to $1M
Base Elizabeth City Outside Telecommunications Cable Plant Install Phase 1
Forecast ID: *F2025071789
Forecast details
Requirement
The Coast Guard is replacing the existing fiber optic cable with next generation, single-mode, air blown fiber optic cable for the outside cable plant at Base Elizabth City, NC
This is a planning forecast, not a solicitation. Dates, values, and set-asides are agency estimates and can change before the official RFP is posted on SAM.gov.