BBT OK0005 NATC Renew D3030 Cooling Generating Systems
Forecast details
Requirement
The replacement of the existing cooling system and pneumatic dampeners with new electrical connection. 1. Remove the existing Carrier 90-ton air cooled chiller and properly remove refrigerant 410-A (Freon). The work will also include the removal of pneumatic dampeners and piping for each of them. 2 The new unit will be placed on the existing pad and will be at minimum a 100-ton air cooled chiller to run at maximum efficiency and have a gas fired element to aid in heating mode during wintertime. 3 Install new electrical panel to match the power requirement of the chiller electrical load. 4 Contractor will be responsible for contracting a crane for the removal and installation of the chillers. Acquisition Strategy: This is an 8(a) direct award.