ICE/M&A8(a)$2M to $5M
Conversion of Existing Lighting System to Energy-Efficient LED Lighting with Occupancy Sensors and Smart Controls to Reduce Energy Consumption, Demand, and Cost
Forecast ID: F2026074154
Forecast details
Requirement
The Contractor shall provide all engineering services, labor, supervision, project management, equipment, materials, testing, commissioning, documentation, and all other necessary items to furnish and install energy-efficient light-emitting diode (LED) lighting fixtures and lighting occupancy sensors throughout the ICE Batavia Service Processing Center (SPC) in Batavia, New York. The Contractor shall also remove, demolish, and properly dispose of (or recycle, where practicable) all existing fluorescent fixtures, lamps, and/or ballasts that are replaced.
This is a planning forecast, not a solicitation. Dates, values, and set-asides are agency estimates and can change before the official RFP is posted on SAM.gov.