FEMASB$500K to $1M
Electric Panel Motor Center Replacement
Forecast ID: F2026074166
Forecast details
Requirement
The Electric Motor Control Center (Electrical Main Panel), installed in 1962, is a vital infrastructure component for the facility’s daily operations. Facility Condition Assessments conducted in 2014, 2018, and 2022 have documented significant material deterioration, increased risk of system failure, and limited availability of replacement parts. The panel is currently operating marginally, struggling to meet minimum standards, and is expected to decline further, threatening operational continuity and safety
This is a planning forecast, not a solicitation. Dates, values, and set-asides are agency estimates and can change before the official RFP is posted on SAM.gov.