Maintenance & Repair Ida Lewis Building
Forecast details
Requirement
The scope of work generally consists of interior and exterior repairs to the building structure/envelope, construction of new interior partitions, removal and replacement of low-slope roofing systems, as well as the removal and replacement of select HVAC equipment at the Ida Lewis Auditorium at Training Center Cape May. Work includes, but is not limited to: - The repair of exterior CMU wall assembly; - The repair of exterior concrete ramp and stairs, including tile finish; - The construction of new interior partitions; including the installation of interior doors; - The removal of exiting EPDM roofing system, and the installation of new modified bituminous roofing system; - The removal of existing air handlers, boilers, condensers, insulated ductwork, dampers, and associated controls; and the installation of new air handlers, boilers, condensers, insulated ductwork, dampers, and associated controls.
About this market
Department of Homeland Security awards in NAICS 236220 over the last 3 years.
- Typical award size
- The median award was $1.4M; the middle half ran from $380K to $4.9M (700 priced awards).
- Competition
- 76% of 693 awards were competed; median 4 offers.
- Largest vendors
- FISHER SAND & GRAVEL CO — 5 awards, $5.7B
- BARNARD CONSTRUCTION COMPANY, INCORPORATED — 5 awards, $4.2B
- BCCG A JOINT VENTURE — 7 awards, $3.0B
- SLS FEDERAL SERVICES LLC — 3 awards, $1.4B
- BARNARD SPENCER JOINT VENTURE — 7 awards, $1.4B
- Largest recent awards
- $1.8B to FISHER SAND & GRAVEL CO, signed Jan 29, 2026
- $1.8B to BARNARD CONSTRUCTION COMPANY, INCORPORATED, signed Apr 24, 2026
- $1.7B to FISHER SAND & GRAVEL CO, signed Jan 23, 2026
- $1.6B to FISHER SAND & GRAVEL CO, signed Dec 17, 2025
- $1.1B to SPENCER CONSTRUCTION LLC, signed Mar 18, 2026
- Recompete pipeline
- 169 contracts of $100K or more in this market end between 90 days and 18 months from now.
Computed from USAspending award data on Oct 25, 2026.