USCG/SFLCTBD$1M to $2M
MORRO BAY #2 MDE CSO FY26
Forecast ID: F2026073354
Forecast details
Requirement
MORRO BAY #2 MDE CSO FY26.Center Section Overhaul for United States Coast Guard Cutter Morro Bay (WTGB 106) is a 140' ice Breaking Tug home ported out of Cleveland, Ohio. This is to conduct required overhaul of MORRO BAY’s #2 Main Diesel Engine.The maintenance and overhaul of the installed Fairbank Morse engine is required in support of the original equipment manufacturer's and the USCG's planned maintenance schedule to maximize the equipment's efficiency and lifespan.
This is a planning forecast, not a solicitation. Dates, values, and set-asides are agency estimates and can change before the official RFP is posted on SAM.gov.