M&R Bldg 205 SSO Locker
Forecast details
Requirement
The SSO Locker Building (Bldg. 205) serves as the sole ready gear locker/wet room facility at Sector New York. The building is a single story 5291 SF prefabricated modular structure constructed in 2006 on a concrete block foundation with a flat roof and surrounded by a faux brick skirt. The building contains Male and Female locker rooms, heads, wet rooms and storage spaces. The roof has numerous leaks. The fire alarm system no longer functions (due to water intrusion) and the building lacks emergency egress signs and modern lighting. The building (essentially a large locker room/head) is not ventilated (non-code compliant construction) and contains a continuous strong musty odor. The ½” thick exterior brick facade architectural panels are peeling away from the building. The wooden access staircases and doors are rotting. The vinyl flooring has rips and gashes throughout caused by the flexing of the poorly supported under flooring. SCOPE: Summary: This project will replace the roof and façade, replace the entryways, add ventilation, replace the fire alarm and replace the flooring/sub-floor.
About this market
Department of Homeland Security awards in NAICS 236220 over the last 3 years.
- Typical award size
- The median award was $1.4M; the middle half ran from $380K to $4.9M (700 priced awards).
- Competition
- 76% of 693 awards were competed; median 4 offers.
- Largest vendors
- FISHER SAND & GRAVEL CO — 5 awards, $5.7B
- BARNARD CONSTRUCTION COMPANY, INCORPORATED — 5 awards, $4.2B
- BCCG A JOINT VENTURE — 7 awards, $3.0B
- SLS FEDERAL SERVICES LLC — 3 awards, $1.4B
- BARNARD SPENCER JOINT VENTURE — 7 awards, $1.4B
- Largest recent awards
- $1.8B to FISHER SAND & GRAVEL CO, signed Jan 29, 2026
- $1.8B to BARNARD CONSTRUCTION COMPANY, INCORPORATED, signed Apr 24, 2026
- $1.7B to FISHER SAND & GRAVEL CO, signed Jan 23, 2026
- $1.6B to FISHER SAND & GRAVEL CO, signed Dec 17, 2025
- $1.1B to SPENCER CONSTRUCTION LLC, signed Mar 18, 2026
- Recompete pipeline
- 169 contracts of $100K or more in this market end between 90 days and 18 months from now.
Computed from USAspending award data on Oct 25, 2026.