USCG/SFLCTBD$2M to $5M
MUNRO Dockside FQ1 FY27
Forecast ID: F2026072730
Forecast details
Requirement
Coast Guard Cutter (CGC) MUNRO Dock Side (DS) Fiscal Quarter 1(FQ1) Fiscal Year 2027 (FY27): Contractor will be required to perform dock side ship repair including welding, electrical, tank cleaning, ventilation cleaning/repair, steel work, equipment overhaul/repair, insulation renewal, deck preservation, and others in accordance with the Specifications (will be attached with the solicitation). Place of performance is the ship's homeport located at Alameda, Ca
This is a planning forecast, not a solicitation. Dates, values, and set-asides are agency estimates and can change before the official RFP is posted on SAM.gov.