Relocation of MIFC-LANT, PSN: 25788783
Forecast details
Requirement
The overall objective of this design-build project is to deliver a fully functional, code-compliant, and secure office facility for approximately 100 staff. Project is a renovation of an existing building. Key requirements include: Abatement of hazardous materials (lead, asbestos, and mold) throughout the building. Demolition of existing interior partitions and construction of new interior walls to create a new office layout, including both classified and unclassified spaces. Installation of a Sensitive Compartmented Information Facility (SCIF) meeting ICD705 and other applicable security requirements. Replacement of existing windows and repairs/upgrades to the building envelope. Complete overhaul of the HVAC, electrical, and plumbing systems to meet current codes and support the new office configuration. Structural repairs as needed to ensure the building meets code and safety standards. Build-out of specialized spaces, including command offices, virtual teleconference rooms, and general office areas Alternations required for ADA compliance (possibly including a two-story elevator). Federal Facilities must achieve energy performance that is 30% better than ASHRAE Standard 90.1-2022 (or newer, as adopted by the applicable version of the International Building Code). This notice is intended to inform potential contractors of the scope and complexity of this upcoming project.
About this market
Department of Homeland Security awards in NAICS 236220 over the last 3 years.
- Typical award size
- The median award was $1.4M; the middle half ran from $380K to $4.9M (700 priced awards).
- Competition
- 76% of 693 awards were competed; median 4 offers.
- Largest vendors
- FISHER SAND & GRAVEL CO — 5 awards, $5.7B
- BARNARD CONSTRUCTION COMPANY, INCORPORATED — 5 awards, $4.2B
- BCCG A JOINT VENTURE — 7 awards, $3.0B
- SLS FEDERAL SERVICES LLC — 3 awards, $1.4B
- BARNARD SPENCER JOINT VENTURE — 7 awards, $1.4B
- Largest recent awards
- $1.8B to FISHER SAND & GRAVEL CO, signed Jan 29, 2026
- $1.8B to BARNARD CONSTRUCTION COMPANY, INCORPORATED, signed Apr 24, 2026
- $1.7B to FISHER SAND & GRAVEL CO, signed Jan 23, 2026
- $1.6B to FISHER SAND & GRAVEL CO, signed Dec 17, 2025
- $1.1B to SPENCER CONSTRUCTION LLC, signed Mar 18, 2026
- Recompete pipeline
- 169 contracts of $100K or more in this market end between 90 days and 18 months from now.
Computed from USAspending award data on Oct 25, 2026.