USCGC STRATTON Drydock FY27
Forecast details
Requirement
U.S. Coast Guard (USCG) 418’ Maritime Security Cutter-Large (WMSL) drydock maintenance and repairs for USCGC STRATTON homeported in Alameda, CA, in Fiscal Year (FY) 2027. Drydock maintenance and repairs include: vessel dry-docking, tank inspection and preservation, interior and exterior ship structure preservation, propulsion shafting strain gauge alignment, propulsion shafting inspections, propulsion shaft seal maintenance, propeller cleaning and inspection, controllable pitch propeller hub assembly maintenance, fathometer transducer maintenance, doppler speed log maintenance, sea strainer overhauls, sea valve overhauls, rudder maintenance, rudder seal maintenance, anchor and anchor chain maintenance and preservation, stern boat ramp maintenance and preservation, transom doors modification, sideport door inspection and maintenance, cathodic protection system maintenance, sea trial performance support, and similar work.
About this market
Department of Homeland Security awards in NAICS 336611 over the last 3 years.
- Typical award size
- The median award was $69K; the middle half ran from $20K to $831K (481 priced awards).
- Competition
- 80% of 513 awards were competed; median 3 offers.
- Largest vendors
- BOLLINGER SHIPYARDS LOCKPORT, L.L.C. — 2 awards, $3.0B
- EASTERN SHIPBUILDING GROUP, INC. — 1 award, $1.4B
- AUSTAL USA, LLC — 1 award, $1.2B
- RAUMA MARINE CONSTRUCTIONS OY — 1 award, $520.5M
- BIRDON AMERICA INC — 10 awards, $462.7M
- Largest recent awards
- $2.0B to BOLLINGER SHIPYARDS LOCKPORT, L.L.C., signed Dec 9, 2025
- $1.4B to EASTERN SHIPBUILDING GROUP, INC., signed Feb 20, 2026
- $1.2B to AUSTAL USA, LLC, signed Feb 26, 2026
- $921.7M to BOLLINGER SHIPYARDS LOCKPORT, L.L.C., signed Dec 19, 2025
- $520.5M to RAUMA MARINE CONSTRUCTIONS OY, signed Dec 26, 2025
- Recompete pipeline
- 10 contracts of $100K or more in this market end between 90 days and 18 months from now.
Computed from USAspending award data on Oct 25, 2026.