USCG/SFLCSB$500K to $1M
USCGC STURGEON DS FY27
Forecast ID: F2026073852
Forecast details
Requirement
This will be a ship repair contract for USCGC STURGEON FY27 Dock Side maintenance availability designed to complete a W5 overhaul of both main diesel engines. The execution of this contract and following work will take place at the cutter’s homeport facility located at Portland, ME unless otherwise specified within the solicitation and provided statement of work. The estimated period of performance start date is 10NOV26 and end date is 08DEC26.
This is a planning forecast, not a solicitation. Dates, values, and set-asides are agency estimates and can change before the official RFP is posted on SAM.gov.