BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.
Federal contractor profile
Total Awards
12
Total $
$47.9M
Top Agency
Department of Transportation
NAICS Count
1
Total Awards
12
Total Obligated
$47.9M
Agencies Served
2
Expiring Contracts
5
Top Agencies
| Agency | Awards | Total Obligated |
|---|---|---|
| Department of Transportation | 8 | $43.3M |
| Department of Agriculture | 4 | $4.6M |
Top NAICS Codes
| NAICS Code | Description | Awards |
|---|---|---|
| 237310 | HIGHWAY, STREET, AND BRIDGE CONSTRUCTION | 12 |
Expiring Contracts (5)
693C7326F00015N199 days remaining
PROJECT NC NP BLRI 2K13; NC NP BLRI 2K14 THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 316.4, 325.8 AND 325.9. THE WORK INCLUDES BRIDGE RAIL REPLACEMENT CONCRETE REPAIR, RIPRAP PLACEMENT, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, CULVER
Department of Transportation|Expires Mar 30, 2027
$17.0M
693C7326F00015N199 days remaining
PROJECT NC NP BLRI 2K13; NC NP BLRI 2K14 THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 316.4, 325.8 AND 325.9. THE WORK INCLUDES BRIDGE RAIL REPLACEMENT CONCRETE REPAIR, RIPRAP PLACEMENT, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, CULVER
Department of Transportation|Expires Mar 30, 2027
$10.2M
693C7324F00075N321 days remaining
PROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANA
Department of Transportation|Expires Jul 30, 2027
$2.0M
693C7322F00103N322 days remaining
PROJECT NP SER BMS FY22(1) THE PROJECT CONSISTS OF PREVENTIVE MAINTENANCE REPAIRS ON 19 BRIDGES WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILL
Department of Transportation|Expires Jul 31, 2027
$1.9M
12444726F002769 days remaining
CONTRACT FOR DISASTER RECOVERY SERVICES TO PROVIDE EMERGENCY REMOVAL AND DISPOSAL OF HAZARDOUS DEBRIS DEPOSITED FROM HURRICANE HELENE ON FEDERAL-OWNED LANDS AND WATERS AT MULTIPLE CRITICAL SITES ON THE CHEROKEE NATIONAL FOREST. DEBRIS INCLUDES HAZARD
Department of Agriculture|Expires Nov 20, 2026
$961,101.7
All Awards
PROJECT NC NP BLRI 2K13; NC NP BLRI 2K14 THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 316.4, 325.8 AND 325.9. THE WORK INCLUDES BRIDGE RAIL REPLACEMENT CONCRETE REPAIR, RIPRAP PLACEMENT, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, CULVER
Department of Transportation693C7326F00015N$17.0M
FIRM FIXED PRICE
PROJECT NC NP BLRI 2K13; NC NP BLRI 2K14 THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 316.4, 325.8 AND 325.9. THE WORK INCLUDES BRIDGE RAIL REPLACEMENT CONCRETE REPAIR, RIPRAP PLACEMENT, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, CULVER
Department of Transportation693C7326F00015N$10.2M
PROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK.
Department of Transportation693C7319C000008$7.7M
THE PROPOSED WORK INCLUDES EMERGENCY HAZARDOUS DEBRIS REMOVAL ON FEDERAL LANDS TO MANAGE IMMEDIATE THREATS TO PUBLIC HEALTH AND SAFETY, PROTECT THE LOCAL ECONOMY, AND MINIMIZE THE INTRODUCTION OF CONTAMINANTS INTO THE NEARBY WATERWAY. INCLUDES APPROP
Department of Agriculture12363N26F4048$2.8M
NC ERFO NP BLRI 2024-1(9) THE PROJECT CONSISTS OF ROADWAY EXCAVATION, EMBANKMENT CONSTRUCTION, CULVERT REPLACEMENT, PAVEMENT PATCHING, REESTABLISHING SLOPE, BACKFILLING WITH FALLEN SOIL, TURF ESTABLISHMENT AND TOPSOIL, STONE MASONRY WORK, AND OTHE
Department of Transportation693C7325F00088N$2.4M
FIRM FIXED PRICE
PROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANA
Department of Transportation693C7324F00075N$2.0M
PROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANA
Department of Transportation693C7324F00075N$2.0M
PROJECT NP SER BMS FY22(1) THE PROJECT CONSISTS OF PREVENTIVE MAINTENANCE REPAIRS ON 19 BRIDGES WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILL
Department of Transportation693C7322F00103N$1.9M
CONTRACT FOR DISASTER RECOVERY SERVICES TO PROVIDE EMERGENCY REMOVAL AND DISPOSAL OF HAZARDOUS DEBRIS DEPOSITED FROM HURRICANE HELENE ON FEDERAL-OWNED LANDS AND WATERS AT MULTIPLE CRITICAL SITES ON THE CHEROKEE NATIONAL FOREST. DEBRIS INCLUDES HAZARD
Department of Agriculture12444726F0027$961,101.7
FIRM FIXED PRICE
EMERGENCY ROAD REPAIRS TO 1.73 MILES OF ROAN MOUNTAIN ROAD INCLUDING MILLING, PATCHING AND OVERLAYS.
Department of Agriculture12445225F0029$770,559.63
UWHARRIE HUNT CAMP PARKING LOT IMPROVEMENTS NC MATOC SEED PROJECT
Department of Agriculture12445224F0080$56,433.77
ORDER DEPENDENT (IDV ALLOWS PRICING ARRANGEMENT TO BE DETERMINED SEPARATELY FOR EACH ORDER)SMALL BUSINESS SET ASIDE - TOTAL
SOUTH REGION CONSTRUCTION MATOC: INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO PERFORM SUBSEQUENT TASK ORDERS FOR HIGHWAY, STREET, AND/OR BRIDGE CONSTRUCTION SERVICES POTENTIALLY WITH INCIDENTAL DESIGN SERVICES AND/OR DESIGN-BUILD SE
Department of Transportation693C7326D0000060
Related insights
Spend by Year
Annual obligated spend trend
Top Agencies
Spend distribution by awarding agency