KOVILIC CONSTRUCTION CO INC
Federal contractor profile
Total Awards
7
Total $
$24.3M
Top Agency
Department of Transportation
NAICS Count
2
Total Awards
7
Total Obligated
$24.3M
Agencies Served
3
Expiring Contracts
5
Top Agencies
| Agency | Awards | Total Obligated |
|---|---|---|
| Department of Transportation | 5 | $21.9M |
| Department of Defense | 1 | $1.3M |
| Department of Agriculture | 1 | $1.2M |
Top NAICS Codes
Expiring Contracts (5)
693C7324C000017367 days remaining
WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION,
Department of Transportation|Expires Oct 31, 2027
$10.2M
693C7325F00122N97 days remaining
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP
Department of Transportation|Expires Feb 3, 2027
$4.1M
693C7326F00002N398 days remaining
PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO
Department of Transportation|Expires Dec 1, 2027
$1.6M
693C7324F00015N428 days remaining
PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE
Department of Transportation|Expires Dec 31, 2027
$1.3M
12445226C0013214 days remaining
COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT
Department of Agriculture|Expires May 31, 2027
$1.2M
All Awards
SMALL BUSINESS SET ASIDE - TOTAL
WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EXCAVATION,
Department of Transportation693C7324C000017$10.2M
FIRM FIXED PRICENO SET ASIDE USED.
ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS
Department of Transportation6982AF24C000006$4.6M
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP
Department of Transportation693C7325F00122N$4.1M
FIRM FIXED PRICE
PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MISCELLANEO
Department of Transportation693C7326F00002N$1.6M
PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE
Department of Transportation693C7324F00015N$1.3M
FRL MACHINERY PLATFORM CONCRETE REHABILITATION
Department of DefenseW9123725C0003$1.3M
SMALL BUSINESS SET ASIDE - TOTAL
COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT
Department of Agriculture12445226C0013$1.2M
Related insights
Spend by Year
Annual obligated spend trend
Top Agencies
Spend distribution by awarding agency