Total Awards
148
Total $
$62.0B
Top Agency
Department of Defense
NAICS Count
10
Total Awards
148
Total Obligated
$62.0B
Agencies Served
3
Expiring Contracts
27

Top NAICS Codes

NAICS CodeDescriptionAwards
541511-22
336411AIRCRAFT MANUFACTURING21
541330ENGINEERING SERVICES21
541715RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)16
336414GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING11
336413OTHER AIRCRAFT PARTS AND AUXILIARY EQUIPMENT MANUFACTURING9
811210ELECTRONIC AND PRECISION EQUIPMENT REPAIR AND MAINTENANCE9
336412AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING7
444130HARDWARE STORES4
332722BOLT, NUT, SCREW, RIVET, AND WASHER MANUFACTURING2

Expiring Contracts (27)

NNG12FD66C155 days remaining

ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.

National Aeronautics and Space Administration|Expires Mar 31, 2027
$437.3M
FA850422F001465 days remaining

C-130 LONG TERM SUSTAINMENT OF C-130 AIRCRAFT FLEET

Department of Defense|Expires Dec 31, 2026
$114.6M
FA862523F3016472 days remaining

C-130J / COMBINED AIRCRAFT DELIVERY DEVELOPMENT INTEGRATION AND ENGINEERING (CADDIE) BLOCK UPGRADE (BU) 7.0/8.1 RETROFIT KIT - LOT 6 UNDEFINITIZED CONTRACT ACTION (UCA)

Department of Defense|Expires Feb 11, 2028
$67.1M
H9240824F0002283 days remaining

TACTICAL FLIGHT MANAGEMENT SYSTEM (TFMS 2.0)

Department of Defense|Expires Aug 6, 2027
$66.6M
FA855325FB00365 days remaining

LONG TERM SUSTAINMENT (LTS) IN SUPPORT FOR THE C-130J UNDER FOREIGN MILITARY SALES CASES: FRANCE-GERMANY C-130J FLEET. CASE: FR-D-QCB. FR-D-QAM

Department of Defense|Expires Dec 31, 2026
$33.4M
80GSFC20C00594 days remaining

THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.

National Aeronautics and Space Administration|Expires Oct 31, 2026
$32.2M
FA862525FB00296 days remaining

C-130J COMBINED AIRCRAFT DELIVERY DEVELOPMENT INTEGRATION AND ENGINEERING (CADDIE)- C130J- CORE SUPPORT SERVICES- FOLLOW ON

Department of Defense|Expires Jan 31, 2027
$24.2M
FA850425FB028120 days remaining

C-130 FULL SCALE WING DURABILITY TEST

Department of Defense|Expires Feb 24, 2027
$16.1M
FA865021C5408254 days remaining

HARDENED MATERIALS AND PROCESSING RESEARCH

Department of Defense|Expires Jul 8, 2027
$12.7M
70B02C24C0000000165 days remaining

P-3 AIRCRAFT ENGINEERING SUPPORT FOR THE P-3 MISSION MANAGEMENT SYSTEM AND TECHNICAL FIELD SUPPORT SERVICES FOR THE P-3 AEW AND LRT AIRCRAFT

Department of Homeland Security|Expires Dec 31, 2026
$4.9M
FA945325CX015434 days remaining

ADVANCED FUZING FOR NON-BALLISTIC REENTRY VEHICLES

Department of Defense|Expires Jan 4, 2028
$3.2M
80GSFC26C0024308 days remaining

SPACE WEATHER GEOSTATIONARY (SW GEO) PHOTOSPHERIC MAGNETOGRAPH IMAGER (PHOMI) PHASE A STUDY

National Aeronautics and Space Administration|Expires Aug 31, 2027
$1.5M
FA862523F000165 days remaining

C-130J COMBINED AIRCRAFT DELIVERY DEVELOPMENT INTEGRATION AND ENGINEERING (CADDIE)/. PROVIDE REMOVABLE MEMORY MODULE (RMM) CARD SOFTWARE KITS

Department of Defense|Expires Dec 31, 2026
$1.3M
FA880725FB00434 days remaining

ANOMALY MITIGATION AND LIFE EXTENSION SUPPORT IN ACCORDANCE WITH SECTION J, ATTACHMENT 2 - PERFORMANCE WORK STATEMENT

Department of Defense|Expires Nov 30, 2026
$1.2M
70Z03826FD0000003292 days remaining

DELIVERY ORDER OF TEST SETS TO BE USED TO SUPPORT USCG AIRCRAFT.

Department of Homeland Security|Expires Aug 15, 2027
$249,557.74
FA855326F000182 days remaining

C-130J SUSTAINMENT SUPPORT FOR THE ROYAL NORWEGIAN AIR FORCE (RNOAF).

Department of Defense|Expires Jan 17, 2027
$155,587.25
FA855326F000182 days remaining

C-130J SUSTAINMENT SUPPORT FOR THE ROYAL NORWEGIAN AIR FORCE (RNOAF).

Department of Defense|Expires Jan 17, 2027
$155,587.25
N0038326PAA04505 days remaining

COMMUNICATIONS CONT

Department of Defense|Expires Mar 15, 2028
$150,511.5
SPE7M226V009042 days remaining

8511689951!CABLE ASSEMBLY-SWIT

Department of Defense|Expires Dec 8, 2026
$71,740
SPE7M226P074949 days remaining

8511777171!CABLE ASSEMBLY,SPEC

Department of Defense|Expires Dec 15, 2026
$56,145.99
SPE4AX23F0344430 days remaining

8509472379!WINDSHIELD PANEL,AI

Department of Defense|Expires Dec 31, 2027
$49,104
SPE4AX23F576065 days remaining

8510013370!WINDSHIELD PANEL,AI

Department of Defense|Expires Dec 31, 2026
$45,969
N0010426PBB7691 days remaining

SWITCH ASSEMBLY

Department of Defense|Expires Jan 26, 2027
$43,726.98
N0010426PBD4924 days remaining

AIR FILLER BOX

Department of Defense|Expires Nov 20, 2026
$33,661.88
SPE7M226P0184164 days remaining

8511697124!RELAY,SOLID STATE

Department of Defense|Expires Apr 9, 2027
$22,342
N0010426PBD4227 days remaining

JACKING SCREW KIT

Department of Defense|Expires Nov 23, 2026
$11,967
SPE7M226V096944 days remaining

8511794126!CABLE ASSEMBLY-SWIT

Department of Defense|Expires Dec 10, 2026

All Awards

COST PLUS AWARD FEENO SET ASIDE USED.

TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION

National Aeronautics and Space AdministrationNNJ06TA25C$15.5B
COST PLUS INCENTIVE FEENO SET ASIDE USED.

NEXT GENERATION OVERHEAD PERSISTENT INFRARED GEOSYNCHRONOUS EARTH ORBIT SPACE VEHICLE 1-3 PHASE 1

Department of DefenseFA881018C0005$6.3B
COST PLUS INCENTIVE FEENO SET ASIDE USED.

NEXT GENERATION OVERHEAD PERSISTENT INFRARED GEOSYNCHRONOUS EARTH ORBIT SPACE VEHICLE 1-3 PHASE 1

Department of DefenseFA881018C0005$6.3B
COST PLUS FIXED FEENO SET ASIDE USED.

IR CPS WS DEVELOPMENT AND INTEGRATION

Department of DefenseN0003019C0025$4.0B
COST PLUS FIXED FEENO SET ASIDE USED.

IR CPS WS DEVELOPMENT AND INTEGRATION

Department of DefenseN0003019C0025$4.0B
FIRM FIXED PRICE

C-130J, ACAT 1, FIVE YEAR ORDERING CONTRACT, MYP3 AP

Department of DefenseFA862518F7027$3.5B
COST PLUS AWARD FEE

EXTERNAL TANK

National Aeronautics and Space AdministrationMSFC0198806DNAS836200$3.5B
COST PLUS INCENTIVE FEENO SET ASIDE USED.

ORION PRODUCTION AND OPERATIONS CONTRACT

National Aeronautics and Space Administration80JSC019C0012$3.2B
COST PLUS INCENTIVE FEE

PRODUCTION AND O&M FOR 35 EXTERNAL TANKS

National Aeronautics and Space AdministrationMSFC0199911DNAS800016$2.9B
COST PLUS AWARD FEENO SET ASIDE USED.

THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT.

National Aeronautics and Space AdministrationNNG09HR00C$2.1B
FIXED PRICE INCENTIVENO SET ASIDE USED.

SPACE BASED INFRARED SYSTEMS CONTRACTOR LOGISTICS SUPPORT. PRODUCT SUPPORT INTEGRATION, CONTRACT EVOLUTION

Department of DefenseFA882321C0001$1.3B
COST PLUS INCENTIVE FEENO SET ASIDE USED.

MK21A RE-ENTRY VEHICLE -ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) EARLY PRODUCTION AND DEPLOYMENT (P&D)

Department of DefenseFA821924C0001$1.2B
COST PLUS INCENTIVE FEENO SET ASIDE USED.

MK21A RE-ENTRY VEHICLE -ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) EARLY PRODUCTION AND DEPLOYMENT (P&D)

Department of DefenseFA821924C0001$1.2B
COST PLUS INCENTIVE FEENO SET ASIDE USED.

THE UNITED STATES GOVERNMENT'S (USG) TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) PROJECT OFFICE HAS THE REQUIREMENT TO PROVIDE MAINTENANCE AND SUSTAINMENT FOR THE TWO THAAD BATTERIES WEAPON SYSTEMS IN SUPPORT OF A FOREIGN MILITARY SALES (FMS) CASE ESTABLISHED WITH THE GOVERNMENT OF THE UNITED ARAB EMIRATES (UAE). THE PURPOSE OF ACTION IS TO AWARD THE MAINTENANCE AND SUSTAINMENT CONTRACT.

Department of DefenseHQ014719C5001$800.1M
COST PLUS INCENTIVE FEE

COMBINED ORBITAL OPERATIONS, LOGISTICS, AND RESILIENCY CORE SUSTAINMENT.

Department of DefenseFA882321F2006$656.2M
FIXED PRICE INCENTIVE

C-130J FY21 CONGRESSIONAL ADDS

Department of DefenseFA862521F3012$646.5M
COST PLUS AWARD FEENO SET ASIDE USED.

ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.

National Aeronautics and Space AdministrationNNG12FD66C$437.3M
COST PLUS FIXED FEE

THIS IS THE PRE-OMNIBUS TASK ORDER. IT IS TO BEGIN THE DEVELOPMENT OF THAAD SOFTWARE 4.1 AND 5.0.

Department of DefenseHQ085321F0004$430.6M

THIS IS THE PRE-OMNIBUS TASK ORDER. IT IS TO BEGIN THE DEVELOPMENT OF THAAD SOFTWARE 4.1 AND 5.0.

Department of DefenseHQ085321F0004$429.6M
FIXED PRICE INCENTIVE

C-130J COMBINED AIRCRAFT DELIVERY DEVELOPMENT INTEGRATION AND ENGINEERING (CADDIE) FY24 CONGRESSIONAL ADD A/C EFFORT

Department of DefenseFA862525FB007$372.2M
COST PLUS FIXED FEENO SET ASIDE USED.

RESERVED

Department of DefenseN0003022C1025$366.8M
COST PLUS AWARD FEENO SET ASIDE USED.

DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT

National Aeronautics and Space Administration80GSFC24CA001$363.4M
COST PLUS AWARD FEENO SET ASIDE USED.

THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.

National Aeronautics and Space AdministrationNNG17FD73C$347.8M
COST PLUS FIXED FEENO SET ASIDE USED.

IGF::OT::IGF SUSTAINMENT SUPPORT FISCAL YEAR 12-16

Department of DefenseFA881013C0002$276.3M
COST PLUS INCENTIVE FEE

CORE OPERATIONS AND SUSTAINMENT PROVIDES INTEGRATED SYSTEMS ENGINEERING SUSTAINMENT SUPPORT FOR PROTECTED EXTREMELY HIGH FREQUENCY SATELLITE COMMUNICATIONS SATELLITES, MILSTAR BLOCK I AND II AS WELL AS THE DEFENSE SATELLITE COMMUNICATIONS SYSTEM III

Department of DefenseFA882325FB001$246.8M