LPC CONTRACTORS INC

Federal contractor profile

Total Awards
6
Total $
$230.4M
Top Agency
Department of Transportation
NAICS Count
1
Total Awards
6
Total Obligated
$230.4M
Agencies Served
1
Expiring Contracts
3

Top Agencies

AgencyAwardsTotal Obligated
Department of Transportation6$230.4M

Top NAICS Codes

NAICS CodeDescriptionAwards
237310HIGHWAY, STREET, AND BRIDGE CONSTRUCTION6

All Awards

NO SET ASIDE USED.

PROJECT PR ER PRMNT RPR (10) THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR-10 BETWEEN KMS 41.6 AND 47.5. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, REINFORCED SOIL SLOPE SYSTEMS CONSTRUCTION, DRAINAGE SYSTEM

Department of Transportation693C7322C000008$84.2M
FIRM FIXED PRICENO SET ASIDE USED.

PROJECT PR ER PRMNT RPR (10) THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR-10 BETWEEN KMS 41.6 AND 47.5. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, REINFORCED SOIL SLOPE SYSTEMS CONSTRUCTION, DRAINAGE SYSTEM

Department of Transportation693C7322C000008$80.7M
NO SET ASIDE USED.

PR ER DOT PRMNT RPR(14) - LANDSLIDE REPAIRS, WASHOUTS AND MISC WORK. THE PROJECT CONSISTS OF THE REPAIRS 46 LANDSLIDES, PAVEMENT WASHOUTS, AND OTHER MISCELLANEOUS DAMAGES CAUSED BY HURRICANES IRMA AND MARIA. THE DAMAGES ARE LOCATED IN PR-111 BETWEEN

Department of Transportation693C7323C000017$41.1M

PROJECT PR ER DOT PRMNT RPR(23): THE PROJECT CONSISTS OF REPAIRING LANDSLIDES AND WASHOUTS DAMAGES CAUSED BY HURRICANES IRMA AND MARIA ON PR-1 KM. 111.6 - 111.8 (HWY-3), PR-1 KM. 24.8 (HWY-4), PR-10 KM. 52.3 (HWY-11), PR-10, KM. 30.3-30.4 (HWY-12)

Department of Transportation693C7326C000014$10.8M
SMALL BUSINESS SET ASIDE - TOTAL

PROJECT PR ER DOT PRMNT RPR(18) THE PROJECT CONSISTS OF REPAIRING LANDSLIDES CAUSED BY HURRICANES IRMA AND MARIA ON PR-144 (KM: 18.2, 14.35); PR-146 (KM: 9.8, 14.1, 16.4, 19.3); AND PR-149 (KM: 42.8, 42.9). THE WORK INCLUDES, BUT IS NOT LIMITED TO U

Department of Transportation693C7324C000010$7.2M
FIRM FIXED PRICESMALL BUSINESS SET ASIDE - TOTAL

PROJECT PR ER DOT PRMNT RPR(18) THE PROJECT CONSISTS OF REPAIRING LANDSLIDES CAUSED BY HURRICANES IRMA AND MARIA ON PR-144 (KM: 18.2, 14.35); PR-146 (KM: 9.8, 14.1, 16.4, 19.3); AND PR-149 (KM: 42.8, 42.9). THE WORK INCLUDES, BUT IS NOT LIMITED TO U

Department of Transportation693C7324C000010$6.4M