6
Total Awards
14
Total Obligated
$42.5M
Agencies Served
5
Expiring Contracts
5
Top Agencies
| Agency | Awards | Total Obligated |
|---|---|---|
| Environmental Protection Agency | 1 | $18.6M |
| General Services Administration | 2 | $11.0M |
| Department of Defense | 4 | $8.4M |
| Department of the Interior | 5 | $3.4M |
| Department of Transportation | 2 | $1.2M |
Top NAICS Codes
| NAICS Code | Description | Awards |
|---|---|---|
| 236220 | COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | 6 |
| 236210 | INDUSTRIAL BUILDING CONSTRUCTION | 2 |
| 237130 | POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION | 2 |
| 541330 | ENGINEERING SERVICES | 2 |
| 237310 | HIGHWAY, STREET, AND BRIDGE CONSTRUCTION | 1 |
| 238220 | PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS | 1 |
Expiring Contracts (5)
68HERF26C0021366 days remaining
US EPA ATHENS MAIN LABORATORY CONSOLIDATION PROJECT PHASE 2B
Environmental Protection Agency|Expires Sep 13, 2027
$18.6M
W91CRB24C504479 days remaining
THIS IS A FIRM FIXED PRICE (FFP) CONTRACT TO PROCURE THE PHASE FOUR (4) CAMERA BORDER SECURITY SYSTEM IN SUPPORT OF THE TAJIKISTAN BORDER GUARDS (TBG OR BG) UNDER FOREIGN MILITARY SALES (FMS) CASE DT-B-WAJ FOR ARP EX24040.
Department of Defense|Expires Nov 30, 2026
$4.3M
140P4226C00023 days remaining
SHENANDOAH NATIONAL PARK (SHEN) - REPAIR BIG MEADOWS CAMPGROUND ACCESS ROUTES
Department of the Interior|Expires Sep 15, 2026
$1.9M
6973GH26C0000648 days remaining
WICHITA, KS - ICTD RTR TOWER REPLACEMENTS (4 TOWERS) AT ICTD IN WICHITA, KS IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Department of Transportation|Expires Oct 30, 2026
$637,192.35
6973GH26C00005145 days remaining
KANSAS CITY, MO - MCI RTR TOWER REPLACEMENTS (3 TOWERS) AT MCI IN KANSAS CITY, MO IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Department of Transportation|Expires Feb 4, 2027
$545,733.17
All Awards
NO SET ASIDE USED.
US EPA ATHENS MAIN LABORATORY CONSOLIDATION PROJECT PHASE 2B
Environmental Protection Agency68HERF26C0021$18.6M
FIRM FIXED PRICE8(A) SOLE SOURCE
THIS IS A NEW PROJECT THAT CONSISTS OF THE REMOVAL OF EXISTING BUILDING 62 SWITCHGEAR 62A AND 62B WITH INSTALLATION OF A NEW REPLACEMENT SWITCHGEARS AND THE INSTALLATION OF ATSS FOR PREVENTIVE MAINTENANCE.
General Services Administration47PM1123C0012$8.3M
8(A) SOLE SOURCE
THIS IS A FIRM FIXED PRICE (FFP) CONTRACT TO PROCURE THE PHASE FOUR (4) CAMERA BORDER SECURITY SYSTEM IN SUPPORT OF THE TAJIKISTAN BORDER GUARDS (TBG OR BG) UNDER FOREIGN MILITARY SALES (FMS) CASE DT-B-WAJ FOR ARP EX24040.
Department of DefenseW91CRB24C5044$4.3M
FIRM FIXED PRICE8(A) SOLE SOURCE
UPS REPLACEMENT CONSTRUCTION FOR BUILDING 2 DATA CENTER IN SOUTH RM 019, WHITE OAK CAMPUS, SILVER SPRING, MD
General Services Administration47PM1124C0009$2.7M
FIRM FIXED PRICE8(A) SOLE SOURCE
THE REQUIREMENT IS TO PROVIDE NEW CONSTRUCTION SITED ON THE NSF DAHLGREN INSTALLATION. THIS PROJECT WILL INCLUDE MULTIPLE DESIGN CONSTRUCTION DISCIPLINES NECESSARY TO SUPPORT THE NSWCDD PRTR MISSION. REQUIRED TASKING WILL BE FIRM-FIXED-PRICE (FFP).
Department of DefenseN0017825C2205$2.0M
FIRM FIXED PRICE8(A) SOLE SOURCE
THE REQUIREMENT IS TO PROVIDE NEW CONSTRUCTION SITED ON THE NSF DAHLGREN INSTALLATION. THIS PROJECT WILL INCLUDE MULTIPLE DESIGN CONSTRUCTION DISCIPLINES NECESSARY TO SUPPORT THE NSWCDD PRTR MISSION. REQUIRED TASKING WILL BE FIRM-FIXED-PRICE (FFP).
Department of DefenseN0017825C2205$2.0M
SHENANDOAH NATIONAL PARK (SHEN) - REPAIR BIG MEADOWS CAMPGROUND ACCESS ROUTES
Department of the Interior140P4226C0002$1.9M
FIRM FIXED PRICESMALL BUSINESS SET ASIDE - TOTAL
WICHITA, KS - ICTD RTR TOWER REPLACEMENTS (4 TOWERS) AT ICTD IN WICHITA, KS IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Department of Transportation6973GH26C00006$637,192.35
FIRM FIXED PRICE8(A) SOLE SOURCE
NSWC CRANE FACILITIES MECHANICAL AND ELECTRICAL AUXILIARY REPAIRS
Department of the Interior140D0425C0083$613,157.2
FIRM FIXED PRICESMALL BUSINESS SET ASIDE - TOTAL
KANSAS CITY, MO - MCI RTR TOWER REPLACEMENTS (3 TOWERS) AT MCI IN KANSAS CITY, MO IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Department of Transportation6973GH26C00005$545,733.17
FIRM FIXED PRICE8(A) SOLE SOURCE
THE SCOPE OF THIS EFFORT IS TO PROVIDE ALL MANAGEMENT, LABOR AND SUPERVISION TO ACCOMPLISH THE DESIGN OF THE B198 BOILER HOUSE. CONTRACTOR TO PROVIDE 100% DESIGN DRAWING AND DETAIL SPECIFICATIONS PACKAGE.
Department of the Interior140D0425C0068$382,213.31
FIRM FIXED PRICE8(A) SOLE SOURCE
THE SCOPE OF THIS EFFORT IS TO PROVIDE ALL MANAGEMENT, LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION, SUPERVISION, AND ENVIRONMENTAL AND QUALITY CONTROLS, TO ACCOMPLISH THE BELOW DELIVERABLES IN B3330 AT NAVAL SUPPORT ACTIVITY (NSA) CRANE, LOCATED IN CR
Department of the Interior140D0425C0075$352,048
FIRM FIXED PRICE8(A) SOLE SOURCE
B2523 INSTALL WAREHOUSE STORAGE RACKS B2069, B2053, B2524, B41, B2522 - ANCHOR STORAGE RACKS
Department of the Interior140D0425C0063$153,316.16
FIRM FIXED PRICE
WRNMMC-5, 62,14 REPAIR CONCRETE WALLS, STEPS, AND RAILS
Department of DefenseN4008025F0452$66,842.25
Related insights
Spend by Year
Annual obligated spend trend
Top Agencies
Spend distribution by awarding agency
Related
Agencies
NAICS Codes
236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION236210 - INDUSTRIAL BUILDING CONSTRUCTION237130 - POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION541330 - ENGINEERING SERVICES237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS
Teaming Partners