Total Awards
4
Total Obligated
$1.1M
Agencies Served
2
Expiring Contracts
1

Top Agencies

Top NAICS Codes

NAICS CodeDescriptionAwards
541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)3
541715RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)1

All Awards

COST PLUS FIXED FEESMALL BUSINESS SET ASIDE - TOTAL

ARMY SBIR PHASE II FOR THE EFFORT ENTITLED "GEOMETRY PERTURBATIONS IN HIGH FIDELITY MILLIMETER WAVE TARGET MODELING FOR SCENE GENERATOR SYSTEMS"

Department of DefenseW31P4Q24C0026$1.1M
FIRM FIXED PRICENO SET ASIDE USED.

SIN: 871 2SERVICES REQUIRED UNDER THIS SIN INVOLVE ABSTRACT OR CONCEPT STUDIES AND ANALYSIS, REQUIREMENTS DEFINITION, PRELIMINARY PLANNING, THE EVALUATION OF ALTERNATIVETECHNICAL APPROACHES AND ASSOCIATED COSTS FOR THE DEVELOPMENT OF ENHANCEMENT OFHIGH LEVEL GENERAL PERFORMANCE SPECIFICATIONS OF A SYSTEM, PROJECT, MISSION OR ACTIVITY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO REQUIREMENTS ANALYSIS, COST/COST PERFORMANCE TRADE-OFF ANALYSIS, FEASIBILITY ANALYSIS, DEVELOPING AND COMPLETING FIRE SAFETY EVALUATION WORKSHEETS AS THEY RELATE TO PROFESSIONAL ENGINEERING SERVICES, REGULATORY COMPLIANCE SUPPORT, TECHNOLOGY/SYSTEM CONCEPTUAL DESIGNS, TRAINING, CONSULTING, DEFINE INTERFACES AND ENVIRONMENTS, COLLISION AVOIDANCE ANALYSIS, PERFORM PLUME IMPINGEMENT ANALYSIS, COUPLED LOAD ANALYSIS, CONDUCT SPACECRAFT / SATELLITE MANIFESTING, AND CREATING INTERFACE CONTROL DOCUMENTS. EXAMPLE: THE DEVELOPMENT AND ANALYSIS OF THE TOTAL MISSION PROFILE AND LIFE CYCLE OF THE IMPROVED SATE

General Services AdministrationGS00F207GA0
FIRM FIXED PRICENO SET ASIDE USED.

SIN: 871 2SERVICES REQUIRED UNDER THIS SIN INVOLVE ABSTRACT OR CONCEPT STUDIES AND ANALYSIS, REQUIREMENTS DEFINITION, PRELIMINARY PLANNING, THE EVALUATION OF ALTERNATIVETECHNICAL APPROACHES AND ASSOCIATED COSTS FOR THE DEVELOPMENT OF ENHANCEMENT OFHIGH LEVEL GENERAL PERFORMANCE SPECIFICATIONS OF A SYSTEM, PROJECT, MISSION OR ACTIVITY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO REQUIREMENTS ANALYSIS, COST/COST PERFORMANCE TRADE-OFF ANALYSIS, FEASIBILITY ANALYSIS, DEVELOPING AND COMPLETING FIRE SAFETY EVALUATION WORKSHEETS AS THEY RELATE TO PROFESSIONAL ENGINEERING SERVICES, REGULATORY COMPLIANCE SUPPORT, TECHNOLOGY/SYSTEM CONCEPTUAL DESIGNS, TRAINING, CONSULTING, DEFINE INTERFACES AND ENVIRONMENTS, COLLISION AVOIDANCE ANALYSIS, PERFORM PLUME IMPINGEMENT ANALYSIS, COUPLED LOAD ANALYSIS, CONDUCT SPACECRAFT / SATELLITE MANIFESTING, AND CREATING INTERFACE CONTROL DOCUMENTS. EXAMPLE: THE DEVELOPMENT AND ANALYSIS OF THE TOTAL MISSION PROFILE AND LIFE CYCLE OF THE IMPROVED SATE

General Services AdministrationGS00F207GA0
FIRM FIXED PRICENO SET ASIDE USED.

SIN: 871 2SERVICES REQUIRED UNDER THIS SIN INVOLVE ABSTRACT OR CONCEPT STUDIES AND ANALYSIS, REQUIREMENTS DEFINITION, PRELIMINARY PLANNING, THE EVALUATION OF ALTERNATIVETECHNICAL APPROACHES AND ASSOCIATED COSTS FOR THE DEVELOPMENT OF ENHANCEMENT OFHIGH LEVEL GENERAL PERFORMANCE SPECIFICATIONS OF A SYSTEM, PROJECT, MISSION OR ACTIVITY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO REQUIREMENTS ANALYSIS, COST/COST PERFORMANCE TRADE-OFF ANALYSIS, FEASIBILITY ANALYSIS, DEVELOPING AND COMPLETING FIRE SAFETY EVALUATION WORKSHEETS AS THEY RELATE TO PROFESSIONAL ENGINEERING SERVICES, REGULATORY COMPLIANCE SUPPORT, TECHNOLOGY/SYSTEM CONCEPTUAL DESIGNS, TRAINING, CONSULTING, DEFINE INTERFACES AND ENVIRONMENTS, COLLISION AVOIDANCE ANALYSIS, PERFORM PLUME IMPINGEMENT ANALYSIS, COUPLED LOAD ANALYSIS, CONDUCT SPACECRAFT / SATELLITE MANIFESTING, AND CREATING INTERFACE CONTROL DOCUMENTS. EXAMPLE: THE DEVELOPMENT AND ANALYSIS OF THE TOTAL MISSION PROFILE AND LIFE CYCLE OF THE IMPROVED SATE