WELLS GLOBAL, LLC
Federal contractor profile
Total Awards
58
Total $
$160.0M
Top Agency
Department of Transportation
NAICS Count
1
Total Awards
58
Total Obligated
$160.0M
Agencies Served
1
Expiring Contracts
24
Top Agencies
| Agency | Awards | Total Obligated |
|---|---|---|
| Department of Transportation | 58 | $160.0M |
Top NAICS Codes
| NAICS Code | Description | Awards |
|---|---|---|
| 238210 | ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS | 58 |
Expiring Contracts (24)
6973GH23F0185364 days remaining
F35 FUNDING FOR INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II REV 1 JCN# 1401417
Department of Transportation|Expires Dec 30, 2026
$9.3M
6973GH23F0185364 days remaining
F35 FUNDING FOR INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II REV 1 JCN# 1401417
Department of Transportation|Expires Dec 30, 2026
$9.2M
6973GH20F01180142 days remaining
ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN AND INSTALLATION
Department of Transportation|Expires Mar 18, 2027
$8.4M
6973GH20F011802 days remaining
ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN AND INSTALLATION
Department of Transportation|Expires Oct 29, 2026
$8.3M
6973GH23F00602199 days remaining
F11 FUNDING FOR NEMC EG REPLACEMENT COST FOR ATLN CPDS. JCN 1700177.
Department of Transportation|Expires May 14, 2027
$6.6M
6973GH25F0048065 days remaining
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
Department of Transportation|Expires Dec 31, 2026
$5.1M
6973GH25F0048065 days remaining
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
Department of Transportation|Expires Dec 31, 2026
$5.1M
6973GH25F0048065 days remaining
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
Department of Transportation|Expires Dec 31, 2026
$5.0M
6973GH26F0089790 days remaining
WELLS GLOBAL WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF WORK AT THE ATLANT
Department of Transportation|Expires Jan 25, 2027
$1.9M
6973GH26F0078464 days remaining
DEVELOP A SITE-SPECIFIC PERMANENT POWER SYSTEMS INSTALLATION DESIGN PACKAGE FOR THE CLEVELAND ARTCC (ZOB), UTILIZING THE FAA ACEPS TYPE II, PHASE 2 NATIONAL STANDARD DESIGN AS A TEMPLATE, IN ACCORDANCE WITH THE SCOPE OF WORK TITLED "ACEPS II PH
Department of Transportation|Expires Dec 30, 2026
$1.8M
6973GH24F010163 days remaining
BIL FUNDS. 2023 INDOOR EG AND DIESEL FST BASELINE INSTALLATION FUNDING FOR WASHINGTON DC (DCAF) ATCT JCN:23007744
Department of Transportation|Expires Oct 30, 2026
$1.5M
6973GH26F00487122 days remaining
CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) INSTALLATION AT SAN JAUN, PR (ZSU) CERAP ARTCC
Department of Transportation|Expires Feb 26, 2027
$1.3M
6973GH26F0061281 days remaining
TO FUND THE INSTALLATION OF SUPER CAPACITOR INSTALLATION
Department of Transportation|Expires Jan 16, 2027
$1.2M
6973GH26F0131442 days remaining
CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) MODERNIZATION PROJECT AT WARRENTON COMMAND CENTER (DCC). JCN: 25015989
Department of Transportation|Expires Dec 8, 2026
$347,435
6973GH26F00146185 days remaining
DESIGN FOR THE CRITICAL POWER DISTRIBUTION SYSTEM AT WASHINGTON DC (DCA) ATCT.
Department of Transportation|Expires Apr 30, 2027
$174,115
6973GH26F0142518 days remaining
ACEPS II, PHASE 2 WELLS GLOBAL IS TO REPLACE ALL THE OLD TIRES ON THE TRAILERS OF TEMP SYSTEM 1 MOBILE STANDBY POWER SYSTEM AT THE ZAN ARTCC. PREPARE AND SHIP ALL TRAILERS TO THE WELLS GLOBAL STAGING AREA FOR REFURBISHMENT, AND SEND THE TEMP SYSTEM 1
Department of Transportation|Expires Nov 14, 2026
$149,959
6973GH26F0073565 days remaining
EG SITE SURVEY TRAVEL AND REPORT FUNDING FOR OCEANA, VA (QVR) ARSR JCN: 26003415
Department of Transportation|Expires Dec 31, 2026
$94,614
6973GH26F01419185 days remaining
EG FUNDED, SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR KELLER PEAK, CA (QXP) RCAG JCN: 236218
Department of Transportation|Expires Apr 30, 2027
$37,250.78
6973GH26F002774 days remaining
EG FUNDING FOR SITE SURVEY, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT AT CHARLOTTE, NC (CLTB) TDWR JCN: 1702278
Department of Transportation|Expires Oct 31, 2026
$35,475.74
6973GH26F002824 days remaining
EG FUNDING FOR SITE SURVEY, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT FOR RALEIGH, NC (RDUD) TDWR JCN: 1800115
Department of Transportation|Expires Oct 31, 2026
$35,475.74
6973GH26F01420185 days remaining
SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR AUGUSTA, GA (AGS) ASR JCN: 236152
Department of Transportation|Expires Apr 30, 2027
$35,475.74
6973GH26F002784 days remaining
PROJECT FUNDING FOR SITE SURVEY, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT AT KNOXVILLE, TN (TYSB) RTR JCN: 24016478
Department of Transportation|Expires Oct 31, 2026
$30,299.79
6973GH26F002814 days remaining
EG FUNDED. SITE SURVEY, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT AT MCCOMB, MS (MCBA) RCAG JCN: 24016488
Department of Transportation|Expires Oct 31, 2026
$30,299.79
6973GH26F0021014 days remaining
(F&E) F11 FUNDED DESIGN CHANGE, SITE SPECIFIC: NORFOLK, VA (ORF) ELD JCN:1302445-18068679, PER ELD.
Department of Transportation|Expires Nov 10, 2026
$6,772
All Awards
ACEPS TYPE II PHASE 2 INSTALLATION
Department of Transportation6973GH18F00730$16.6M
FIRM FIXED PRICE
ACEPS TYPE II PHASE 2 INSTALLATION
Department of Transportation6973GH18F00730$16.0M
FIRM FIXED PRICE
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
Department of Transportation6973GH19F01291$12.1M
FIRM FIXED PRICE
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
Department of Transportation6973GH19F00563$11.7M
F35 FUNDING FOR INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II REV 1 JCN# 1401417
Department of Transportation6973GH23F01853$9.3M
FIRM FIXED PRICE
F35 FUNDING FOR INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II REV 1 JCN# 1401417
Department of Transportation6973GH23F01853$9.2M
ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN AND INSTALLATION
Department of Transportation6973GH20F01180$8.4M
FIRM FIXED PRICE
ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN AND INSTALLATION
Department of Transportation6973GH20F01180$8.3M
FIRM FIXED PRICE
INSTALL ACEPS TYPE II PHASE 1 SYSTEM AT THE ALBUQUERQUE ARTCC (ZAB)
Department of Transportation6973GH22F00762$7.5M
FIRM FIXED PRICE
F11 FUNDING FOR NEMC EG REPLACEMENT COST FOR ATLN CPDS. JCN 1700177.
Department of Transportation6973GH23F00602$6.6M
F11 FUNDING FOR NEMC EG REPLACEMENT COST FOR ATLN CPDS. JCN 1700177.
Department of Transportation6973GH23F00602$6.6M
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
Department of Transportation6973GH25F00480$5.1M
FIRM FIXED PRICE
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
Department of Transportation6973GH25F00480$5.1M
FIRM FIXED PRICE
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLC
Department of Transportation6973GH25F00480$5.0M
FIRM FIXED PRICE
{BIL} FUNDED INSTALLATION TO MODERNIZE ESSENTIAL POWER SOURCE AT DTW ATCT CPDS. JCN 1603915
Department of Transportation6973GH22F01587$4.6M
J
F35 BIL FUNDING FOR INSTALLATION AT ANDREWS AFB ADW CPDS JCN 1700009
Department of Transportation6973GH23F01934$4.5M
FIRM FIXED PRICE
F35 BIL FUNDING FOR INSTALLATION AT ANDREWS AFB ADW CPDS JCN 1700009
Department of Transportation6973GH23F01934$4.3M
IIJA FUNDED POWER CABLE REPLACEMENT AND INSTALLATION, SITE SPECIFIC: (STT) ELD, ST. THOMAS, VI, JCN: 19007437, PER ELD.
Department of Transportation6973GH26F00715$2.4M
J
DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIES
Department of Transportation6973GH20F01552$2.0M
FIRM FIXED PRICE
DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIES
Department of Transportation6973GH20F01552$1.9M
WELLS GLOBAL WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF WORK AT THE ATLANT
Department of Transportation6973GH26F00897$1.9M
FIRM FIXED PRICE
F11 - (F&E) FUNDED INSTALLATION/CONSTRUCTION, SITE SPECIFIC: NORFOLK, VA (ORF)ELD, JCN: 1302445, PER ELD, PMO.
Department of Transportation6973GH26F00467$1.9M
DEVELOP A SITE-SPECIFIC PERMANENT POWER SYSTEMS INSTALLATION DESIGN PACKAGE FOR THE CLEVELAND ARTCC (ZOB), UTILIZING THE FAA ACEPS TYPE II, PHASE 2 NATIONAL STANDARD DESIGN AS A TEMPLATE, IN ACCORDANCE WITH THE SCOPE OF WORK TITLED "ACEPS II PH
Department of Transportation6973GH26F00784$1.8M
FIRM FIXED PRICE
BIL FUNDS. 2023 INDOOR EG AND DIESEL FST BASELINE INSTALLATION FUNDING FOR WASHINGTON DC (DCAF) ATCT JCN:23007744
Department of Transportation6973GH24F01016$1.5M
FIRM FIXED PRICE
CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) INSTALLATION AT SAN JAUN, PR (ZSU) CERAP ARTCC
Department of Transportation6973GH26F00487$1.3M
Showing 25 of 58 awards.
Related insights
Spend by Year
Annual obligated spend trend
Related
Agencies
Teaming Partners