AMES FEDERAL CONTRACTING GROUP LLC - THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL
Key Details
Description
THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL
Context & Analysis
On Mar 21, 2025, Department of the Interior obligated $115,063,658.27 to AMES FEDERAL CONTRACTING GROUP LLC for the work associated with the hyrum dam spillway replacement project will take place approximately 9 miles southwest of logan, utah in cache county, utah. the overall work is for the construction of a …. The award is classified under NAICS 237990 — OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. Performance is located in HYRUM, UT. The contract is scheduled through Feb 10, 2029. This award is one of several similar procurements from Department of the Interior under NAICS 237990 — related awards are listed below.
Contractor Information
Similar Awards
THE WORK REQUIRED IS FOR PHASE II OF B.F. SISK DAM SOD MODIFICATIONS.
NW CONSTRUCTION, INC
$257.4M
YOSE 196416 REHABILITATE EL PORTAL WASTEWATER TREATMENT FACILITY AND ADMINISTRATIVE CAMP THE WORK OF THIS CONTRACT IS FOR THE CONSTRUCTION OF: YOSE 196416 REHABILITATE EL PORTAL WASTEWATER TREATMENT FACILITY AND ADMINISTRATIVE CAMP IN YOSEMITE NAT
KIEWIT INFRASTRUCTURE WEST CO.
$217.9M
YOSE 196416 REHABILITATE EL PORTAL WASTEWATER TREATMENT FACILITY AND ADMINISTRATIVE CAMP THE WORK OF THIS CONTRACT IS FOR THE CONSTRUCTION OF: YOSE 196416 REHABILITATE EL PORTAL WASTEWATER TREATMENT FACILITY AND ADMINISTRATIVE CAMP IN YOSEMITE NAT
KIEWIT INFRASTRUCTURE WEST CO.
$217.7M
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1
BWI TPC, A JOINT VENTURE
$187.9M
BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I, THIS PHASE INCLUDES CONSTRUCTION OF SHEAR KEYS, STABILITY BERMS, AND SPILLWAY MODIFICATION. THE PROJECT WILL ADDRESS ISSUES WITH THE SELECT FOUNDATION MATERIALS THAT THE DAM WAS BUILT UPON AND WILL
NW CONSTRUCTION, INC
$139.3M