APEX CONSTRUCTION COMPANY, INC. - WATER INTRUSION MITIGATION STT ATCT AND EQUIPMENT ROOM THE PROJECT SHALL INCLUDE THE FOLLOWING TASKS: A. MECHANICALLY ATTACH TAPERED INSULATION TO DIRECT WATER FLOW INTO FIVE (5) DRAINS. B. MECHANICALLY ATTACH CEMENTITIOUS BACKER BOARD OVER THE
Key Details
Description
WATER INTRUSION MITIGATION STT ATCT AND EQUIPMENT ROOM THE PROJECT SHALL INCLUDE THE FOLLOWING TASKS: A. MECHANICALLY ATTACH TAPERED INSULATION TO DIRECT WATER FLOW INTO FIVE (5) DRAINS. B. MECHANICALLY ATTACH CEMENTITIOUS BACKER BOARD OVER THE
Contractor Information
Similar Awards
HONOLULU COMBINED ATC MEMBRANE ROOF REPLACEMENT.
CORE CONSOLIDATED LLC
$3.3M
THE PROVIDENCE (PVD) AIRPORT TRAFFIC CONTROL TOWER (ATCT) HAS A PROJECT JCN 1800508 FOR A TOTAL ROOF REPLACEMENT OF ATCT BUILDINGS (TOWER CAB, BASE-BUILDING, TECH-OPS, TELCO AND E&G) AND RE-CAULKING OF ATCT BUILDINGS (TOWER, BASE-BUILDING, TECH-O
EMMATY INC
$1.3M
THE PROVIDENCE (PVD) AIRPORT TRAFFIC CONTROL TOWER (ATCT) HAS A PROJECT JCN 1800508 FOR A TOTAL ROOF REPLACEMENT OF ATCT BUILDINGS (TOWER CAB, BASE-BUILDING, TECH-OPS, TELCO AND E&G) AND RE-CAULKING OF ATCT BUILDINGS (TOWER, BASE-BUILDING, TECH-O
EMMATY INC
$1.3M
THE PROVIDENCE (PVD) AIRPORT TRAFFIC CONTROL TOWER (ATCT) HAS A PROJECT JCN 1800508 FOR A TOTAL ROOF REPLACEMENT OF ATCT BUILDINGS (TOWER CAB, BASE-BUILDING, TECH-OPS, TELCO AND E&G) AND RE-CAULKING OF ATCT BUILDINGS (TOWER, BASE-BUILDING, TECH-O
EMMATY INC
$1.3M
ROOF REPLACEMENT AT ADW ATCT AND ORF ATCT
MORE CONSULTING CORP
$1.3M
Stay Updated
Get notified about new opportunities matching your interests.