BARRY WILLIAMS ELECTRIC INC - REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTALL THE ERMS WIRING, UPDATE THE EXISTING UNINTERRUPTED POWER SYSTEM (UPS) WITH AN EATON 93PM-L UPS, MODIFY THE LIGHTNING PROTECTION GROUNDING BONDING SYSTEM (LPGBS), AND CO
Key Details
Description
REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTALL THE ERMS WIRING, UPDATE THE EXISTING UNINTERRUPTED POWER SYSTEM (UPS) WITH AN EATON 93PM-L UPS, MODIFY THE LIGHTNING PROTECTION GROUNDING BONDING SYSTEM (LPGBS), AND CO
Context & Analysis
On Jan 21, 2026, Department of Transportation obligated $439,030.73 to BARRY WILLIAMS ELECTRIC INC for replace the existing engine generator (eg) with a kohler 40kw propane eg, install the erms wiring, update the existing uninterrupted power system (ups) with an eaton 93pm-l ups, modify the lightning p…. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in RICHLAND, MO. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.