This contract expires in 50 days (Oct 31, 2026).
SENTINEL POWER SERVICES, LLC - CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
Key Details
Description
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
Context & Analysis
On May 16, 2024, Department of Transportation obligated $12,306,296.11 to SENTINEL POWER SERVICES, LLC for conduct constructability review for replacement of (5) 15,000-gallon asts, (1) 2000-gallon ast, (1) 1000-gallon gas ast, (3) dts, (2) 80kw egs, (2) shelters, (2580 ft) of remote fill line, and reconfi…. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in KENAI, AK. The contract is scheduled through Oct 31, 2026 — approximately 2 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
F35 FUNDING FOR INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II REV 1 JCN# 1401417
WELLS GLOBAL, LLC
$9.5M
Stay Updated
Get notified about new opportunities matching your interests.