This contract expires in 109 days (Dec 30, 2026).
BARRY WILLIAMS ELECTRIC INC - EG FUNDING. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE FOR CORPUS CHRISTI, TX (CRP) ATCT JCN:23000618
Key Details
Description
EG FUNDING. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE FOR CORPUS CHRISTI, TX (CRP) ATCT JCN:23000618
Context & Analysis
On Aug 6, 2026, Department of Transportation obligated $42,396.35 to BARRY WILLIAMS ELECTRIC INC for eg funding. site survey travel, report and design for the 2025 outdoor eg baseline for corpus christi, tx (crp) atct jcn:23000618. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in CORPUS CHRISTI, TX. The contract is scheduled through Dec 30, 2026 — approximately 4 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.