This contract expires in 18 days (Sep 30, 2026).

Browse related active opportunities

NO SET ASIDE USED.

BOOZ ALLEN HAMILTON INC - TO 167 BASE- GATEWAY REQUIREMENTS, VERIFICATION AND VALIDATION, SYSTEMS INTEGRATION, AND PRODUCTION ASSESSMENT

PIID: 80JSC025FA191
Signed Date: Sep 25, 2025Effective Date: Oct 1, 2025End Date: Closes in 18 days
Award $
$7.5M
Vendor
BOOZ ALLEN HAMILTON INC
NAICS
541330
Signed Date
Sep 25, 2025

Key Details

Dollars Obligated
$7.5M
Base & All Options
$7.5M
Awarding Sub-Agency
National Aeronautics and Space Administration
Parent IDIQ (PIID)
80JSC023AA001
Product Service Code
B599 - SPECIAL STUDIES/ANALYSIS- OTHER
Extent Competed
NOT COMPETED UNDER SAP
Number of Offers
1
Place of Performance
HOUSTON, TX

Description

TO 167 BASE- GATEWAY REQUIREMENTS, VERIFICATION AND VALIDATION, SYSTEMS INTEGRATION, AND PRODUCTION ASSESSMENT

Context & Analysis

On Sep 25, 2025, National Aeronautics and Space Administration obligated $7,480,461 to BOOZ ALLEN HAMILTON INC for to 167 base- gateway requirements, verification and validation, systems integration, and production assessment. The award is classified under NAICS 541330 — ENGINEERING SERVICES. Competition extent: not competed under sap with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in HOUSTON, TX. The contract is scheduled through Sep 30, 2026 — approximately 1 month remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.

Contractor Information

UEI: JCBMLGPE6Z71
Location: MC LEAN, VA

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$661.9M

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.6M

Stay Updated

Get notified about new opportunities matching your interests.

Related