This contract expires in 6 days (Jun 16, 2026).
CCS KING GEORGE 3 LLC - INTAGLIO PRESS 14 AND 24 SITE PREPARATION.
Key Details
Description
INTAGLIO PRESS 14 AND 24 SITE PREPARATION.
Context & Analysis
On Nov 17, 2025, Department of the Treasury obligated $2,924,733 to CCS KING GEORGE 3 LLC for intaglio press 14 and 24 site preparation.. The award is classified under NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION and issued as a firm fixed price contract. Competition extent: not available for competition with 1 offer received. The procurement used a 8(A) SOLE SOURCE set-aside. Performance is located in FORT WORTH, TX. The contract is scheduled through Jun 16, 2026 — approximately 1 month remaining. This award is one of several similar procurements from Department of the Treasury under NAICS 236220 — related awards are listed below.
Contractor Information
Similar Awards
THE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.
FRONTLINE KING GEORGE JV LLC
$5.8M
PROVIDE ALL EXPERTISE, LABOR, TOOLS, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO REPLACE EXISTING AIR HANDLERS (AHU) THROUGHOUT THE FACILITY.
FRONTLINE KING GEORGE JV LLC
$4.9M
MT COOLING TOWERS
CONSTRUCTURE INC
$4.0M
DESIGN AND CONSTRUCT A PALLET RACKING SYSTEM.
VALCORP ENTERPRISES LLC
$3.1M
THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
H2 CONSTRUCTION INC
$2.5M
Stay Updated
Get notified about new opportunities matching your interests.