This contract expires in 111 days (Dec 31, 2026).
CHICKASAW STRATEGIC POINTE, LLC - BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT CLARKSBURG, WV (CKBA) ASR JCN: 1503036
Key Details
Description
BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT CLARKSBURG, WV (CKBA) ASR JCN: 1503036
Context & Analysis
On Aug 30, 2023, Department of Transportation obligated $261,161.78 to CHICKASAW STRATEGIC POINTE, LLC for bil: issue funding for site survey, design, and installation of outdoor eg with subbase tank and erms at clarksburg, wv (ckba) asr jcn: 1503036. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in BRIDGEPORT, WV. The contract is scheduled through Dec 31, 2026 — approximately 4 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.