This contract expires in 322 days (Jul 31, 2027).
C.N.S. COMMUNICATIONS, LLC - F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A
Key Details
Description
F11 CPDS FUNDING IS ALLOCATED FOR A TEMPORARY LOGISTICS SITE DEDICATED TO STAGING, INSPECTING, AND REPAIRING CPDS PROJECT EQUIPMENT EXCLUSIVELY. JCN: N/A
Context & Analysis
On Jul 7, 2025, Department of Transportation obligated $359,760.35 to C.N.S. COMMUNICATIONS, LLC for f11 cpds funding is allocated for a temporary logistics site dedicated to staging, inspecting, and repairing cpds project equipment exclusively. jcn: n/a. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in OKLAHOMA CITY, OK. The contract is scheduled through Jul 31, 2027 — approximately 11 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.