This contract expires in 291 days (Jun 30, 2027).
CUSA CONSULTING LLC - ACEPS II PHASE 2 BOSTON ARTCC (ZBW) PERMANENT DESIGN, BASED ON THE RE-DESIGN SCOPE OF WORK DATED APRIL 13, 2026. ADDITIONALLY, DESIGNING THE REPLACEMENT OF SEVEN STATIC TRANSFER SWITCHES (STS) FROM THE L3 HARRIS I-SERIES TO THE EATON PDI UNITS. JCN 1
Key Details
Description
ACEPS II PHASE 2 BOSTON ARTCC (ZBW) PERMANENT DESIGN, BASED ON THE RE-DESIGN SCOPE OF WORK DATED APRIL 13, 2026. ADDITIONALLY, DESIGNING THE REPLACEMENT OF SEVEN STATIC TRANSFER SWITCHES (STS) FROM THE L3 HARRIS I-SERIES TO THE EATON PDI UNITS. JCN 1
Context & Analysis
On Aug 10, 2026, Department of Transportation obligated $1,444,519.61 to CUSA CONSULTING LLC for aceps ii phase 2 boston artcc (zbw) permanent design, based on the re-design scope of work dated april 13, 2026. additionally, designing the replacement of seven static transfer switches (sts) from th…. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in NASHUA, NH. The contract is scheduled through Jun 30, 2027 — approximately 10 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.