REPLACE EXISTING 4-70 FT. GUY SUPPORTED TOWERS WITH 4-40 FT. SELF SUPPORTING TOWERS AT THE AVON PARK EXECUTIVE AIRPORT (AVO) RCAG SITE LOCATED IN AVON PARK, FL, IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Context & Analysis
On Oct 20, 2025, Department of Transportation obligated $1,036,990 to FLAKE TOWERS, LLC for replace existing 4-70 ft. guy supported towers with 4-40 ft. self supporting towers at the avon park executive airport (avo) rcag site located in avon park, fl, in accordance with the specifications a…. The award is classified under NAICS 237130 — POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources with 1 offer received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in AVON PARK, FL. This award is one of several similar procurements from Department of Transportation under NAICS 237130 — related awards are listed below.
Contractor Information
Similar Awards
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE CONTRACTOR SHALL PROVIDE ALL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$17.7M
TO PROVIDE ACL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$3.9M
THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R
BURTON CONSTRUCTION, INC.
$3.3M