This contract expires in 117 days (Aug 12, 2026).
GREATER SOUTHWEST CONSTRUCTORS INC - CONSTRUCTION TO REPLACE THE RWY 17 (LBX) MALSR SYSTEM AT ANGLETON/LAKE JACKSON TEXAS GULF COAST REGIONAL AIRPORT (LBX)
Key Details
Description
CONSTRUCTION TO REPLACE THE RWY 17 (LBX) MALSR SYSTEM AT ANGLETON/LAKE JACKSON TEXAS GULF COAST REGIONAL AIRPORT (LBX)
Contractor Information
Similar Awards
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE CONTRACTOR SHALL PROVIDE ALL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$17.7M
TO PROVIDE ACL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$3.9M
THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R
BURTON CONSTRUCTION, INC.
$3.3M