This contract expires in 3 days (Sep 15, 2026).
GROT, INC. - FIRE ALARM DEVICE REPLACEMENT PROJECT A90 BOSTON CONSOLIDATED TERMINAL RADAR APPROACH CONTROL (TRACON) FACILITY MERRIMACK, NEW HAMPSHIRE
Key Details
Description
FIRE ALARM DEVICE REPLACEMENT PROJECT A90 BOSTON CONSOLIDATED TERMINAL RADAR APPROACH CONTROL (TRACON) FACILITY MERRIMACK, NEW HAMPSHIRE
Context & Analysis
On Sep 16, 2025, Department of Transportation obligated $851,633.57 to GROT, INC. for fire alarm device replacement project a90 boston consolidated terminal radar approach control (tracon) facility merrimack, new hampshire. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in MERRIMACK, NH. The contract is scheduled through Sep 15, 2026 — approximately 1 month remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.