H2 CONSTRUCTION INC - THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
Key Details
Description
THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
Context & Analysis
On Oct 23, 2025, Department of the Treasury obligated $2,529,311.2 to H2 CONSTRUCTION INC for this project is to replace the old existing power distribution units pdus and remove unneeded cable-whips install new pdus and rpps complete with seismic stands and associated raised floor system modi…. The award is classified under NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION and issued as a firm fixed price contract. Competition extent: competed under sap with 1 offer received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in FALLING WATERS, WV. This award is one of several similar procurements from Department of the Treasury under NAICS 236220 — related awards are listed below.
Contractor Information
Similar Awards
THE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.
FRONTLINE KING GEORGE JV LLC
$5.8M
PROVIDE ALL EXPERTISE, LABOR, TOOLS, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO REPLACE EXISTING AIR HANDLERS (AHU) THROUGHOUT THE FACILITY.
FRONTLINE KING GEORGE JV LLC
$4.9M
MT COOLING TOWERS
CONSTRUCTURE INC
$4.0M
DESIGN AND CONSTRUCT A PALLET RACKING SYSTEM.
VALCORP ENTERPRISES LLC
$3.1M
INTAGLIO PRESS 14 AND 24 SITE PREPARATION.
CCS KING GEORGE 3 LLC
$2.9M
Stay Updated
Get notified about new opportunities matching your interests.