This contract expires in 203 days (Dec 31, 2026).
HIGH COUNTRY CONTRACTORS INC - SUNNYSIDE, UT - CONSTRUCTION TWO (2) NEW 30 FOOT SELF-SUPPORTING ANTENNA TOWERS AT THE SUNNYSIDE (QLC), UTAH RCAG SITE IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Key Details
Description
SUNNYSIDE, UT - CONSTRUCTION TWO (2) NEW 30 FOOT SELF-SUPPORTING ANTENNA TOWERS AT THE SUNNYSIDE (QLC), UTAH RCAG SITE IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Context & Analysis
On Feb 10, 2026, Department of Transportation obligated $730,525 to HIGH COUNTRY CONTRACTORS INC for sunnyside, ut - construction two (2) new 30 foot self-supporting antenna towers at the sunnyside (qlc), utah rcag site in accordance with the specifications and drawings.. The award is classified under NAICS 237130 — POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources with 4 offers received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in EAST CARBON, UT. The contract is scheduled through Dec 31, 2026 — approximately 7 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237130 — related awards are listed below.
Contractor Information
Similar Awards
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE CONTRACTOR SHALL PROVIDE ALL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$17.7M
TO PROVIDE ACL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$3.9M
THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R
BURTON CONSTRUCTION, INC.
$3.3M
Stay Updated
Get notified about new opportunities matching your interests.