This contract expires in 327 days (Aug 5, 2027).
KIK TECHNOLOGIES LLC - THE PURPOSE OF THIS TASK ORDER UNDER KIK IS FOR THE NON-CORE TELECOM IN SACRAMENTO, CA FOR WLAN VTC BUILD OUT. NEED BY: 8/10/2026 ASSOCIATED WORK ORDER: VCW26022 OSPE APPROVAL: TAB S96 (S82), LINE 251
Key Details
Description
THE PURPOSE OF THIS TASK ORDER UNDER KIK IS FOR THE NON-CORE TELECOM IN SACRAMENTO, CA FOR WLAN VTC BUILD OUT. NEED BY: 8/10/2026 ASSOCIATED WORK ORDER: VCW26022 OSPE APPROVAL: TAB S96 (S82), LINE 251
Context & Analysis
On Aug 7, 2026, Department of Transportation obligated $40,464.59 to KIK TECHNOLOGIES LLC for the purpose of this task order under kik is for the non-core telecom in sacramento, ca for wlan vtc build out. need by: 8/10/2026 associated work order: vcw26022 ospe approval: tab s96 (s82), line …. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in WASHINGTON, DC. The contract is scheduled through Aug 5, 2027 — approximately 11 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.