This contract expires in 104 days (Jul 30, 2026).
KOBO UTILITY CONSTRUCTION CORP. - TOWER AND SHELTER REPLACEMENT AT FULLERTON CA (FUL) RTR FULLERTON MUNICIPAL AIRPORT.
Key Details
Description
TOWER AND SHELTER REPLACEMENT AT FULLERTON CA (FUL) RTR FULLERTON MUNICIPAL AIRPORT.
Contractor Information
Similar Awards
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE CONTRACTOR SHALL PROVIDE ALL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$17.7M
TO PROVIDE ACL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$3.9M
THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R
BURTON CONSTRUCTION, INC.
$3.3M
Stay Updated
Get notified about new opportunities matching your interests.