M. C. DEAN, INC. - F&E FUNDED BATTERY ENERGY STORAGE SYSTEM SHELTER (BESS) PURCHASE AND INSTALLATION AT (GDT)ATCBI, GRAND TURK, TURKS AND CAICOS, JCN:25015096, A PART OF THE CARIBBEAN CALL TO ACTION (CCTA) PROJECT(S) ALTERNATE ENERGY SYSTEM (AES), PER ELECTRICAL L
Key Details
Description
F&E FUNDED BATTERY ENERGY STORAGE SYSTEM SHELTER (BESS) PURCHASE AND INSTALLATION AT (GDT)ATCBI, GRAND TURK, TURKS AND CAICOS, JCN:25015096, A PART OF THE CARIBBEAN CALL TO ACTION (CCTA) PROJECT(S) ALTERNATE ENERGY SYSTEM (AES), PER ELECTRICAL L
Context & Analysis
On May 5, 2026, Department of Transportation obligated $725,480.97 to M. C. DEAN, INC. for f&e funded battery energy storage system shelter (bess) purchase and installation at (gdt)atcbi, grand turk, turks and caicos, jcn:25015096, a part of the caribbean call to action (ccta) project(s) al…. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. The contract is scheduled through Oct 31, 2026 — approximately 2 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.