This contract expires in 135 days (Jan 25, 2027).
M. C. DEAN, INC. - IIJA FUNDING. MC DEAN WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 1 & 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF W
Key Details
Description
IIJA FUNDING. MC DEAN WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 1 & 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF W
Context & Analysis
On May 28, 2026, Department of Transportation obligated $687,599 to M. C. DEAN, INC. for iija funding. mc dean will provide the manpower, equipment, materials, tools, and other necessary resources to deliver the products, services, and systems outlined in the aceps ii phase 1 & 2 permanen…. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in FARMINGTON, MN. The contract is scheduled through Jan 25, 2027 — approximately 5 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated