This contract expires in 8 days (Oct 30, 2026).
M. C. DEAN, INC. - M.C. DEAN WILL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, INSTALLATION, AND SERVICES TO REPLACE 42 EXISTING CRITICAL POWER SYSTEM 150A ASCO ATSS WITH 42 NEW 150 AMP L3 RCSTSS AT THE FORT WORTH ARTCC (ZFW), IN ACCORDANCE WITH THE STATEMENT OF WORK AN
Key Details
Description
M.C. DEAN WILL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, INSTALLATION, AND SERVICES TO REPLACE 42 EXISTING CRITICAL POWER SYSTEM 150A ASCO ATSS WITH 42 NEW 150 AMP L3 RCSTSS AT THE FORT WORTH ARTCC (ZFW), IN ACCORDANCE WITH THE STATEMENT OF WORK AN
Context & Analysis
On May 20, 2026, Department of Transportation obligated $140,088.23 to M. C. DEAN, INC. for m.c. dean will provide the necessary personnel, materials, installation, and services to replace 42 existing critical power system 150a asco atss with 42 new 150 amp l3 rcstss at the fort worth artcc …. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in FORT WORTH, TX. The contract is scheduled through Oct 30, 2026 — approximately 1 month remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.