This contract expires in 216 days (Apr 16, 2027).
M. C. DEAN, INC. - MALSR POWER CABLE REPLACEMENT AT THE MONTGOMERY-GIBBS EXECUTIVE AIRPORT RWY-28R (MYF) IN SAN DIEGO, CA, IN ACCORDANCE WITH THE 100% DESIGN DRAWINGS DATED JULY 31, 2026. JCN 26004482.
Key Details
Description
MALSR POWER CABLE REPLACEMENT AT THE MONTGOMERY-GIBBS EXECUTIVE AIRPORT RWY-28R (MYF) IN SAN DIEGO, CA, IN ACCORDANCE WITH THE 100% DESIGN DRAWINGS DATED JULY 31, 2026. JCN 26004482.
Context & Analysis
On Sep 1, 2026, Department of Transportation obligated $1,906,078.96 to M. C. DEAN, INC. for malsr power cable replacement at the montgomery-gibbs executive airport rwy-28r (myf) in san diego, ca, in accordance with the 100% design drawings dated july 31, 2026. jcn 26004482.. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in SAN DIEGO, CA. The contract is scheduled through Apr 16, 2027 — approximately 7 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.