This contract expires in 285 days (Jun 24, 2027).
URBAN ELECTRIC, INC - IIJA FUNDS. 2025 PROPANE BASELINE INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS AT FRESNO, CA (FATA) ATCT JCN:1501845
Key Details
Description
IIJA FUNDS. 2025 PROPANE BASELINE INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS AT FRESNO, CA (FATA) ATCT JCN:1501845
Context & Analysis
On Jul 20, 2026, Department of Transportation obligated $125,090.8 to URBAN ELECTRIC, INC for iija funds. 2025 propane baseline installation per attached sow, approved design drawings at fresno, ca (fata) atct jcn:1501845. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS. Performance is located in FRESNO, CA. The contract is scheduled through Jun 24, 2027 — approximately 10 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.