VISION CONTRACTING INC - PROVIDE ALL LABOR, SERVICES, MATERIALS, EQUIPMENT, SUPERVISION, PERMITS, AND TRANSPORTATION TO REPLACE THE CHAIN LINK CANTILEVER SLIDING GATE AND OPERATOR AT THE WILMINGTON, NC, AIR TRAFFIC CONTROL TOWER (ATCT)
Key Details
Description
PROVIDE ALL LABOR, SERVICES, MATERIALS, EQUIPMENT, SUPERVISION, PERMITS, AND TRANSPORTATION TO REPLACE THE CHAIN LINK CANTILEVER SLIDING GATE AND OPERATOR AT THE WILMINGTON, NC, AIR TRAFFIC CONTROL TOWER (ATCT)
Context & Analysis
On Dec 19, 2025, Department of Transportation obligated $80,102 to VISION CONTRACTING INC for provide all labor, services, materials, equipment, supervision, permits, and transportation to replace the chain link cantilever sliding gate and operator at the wilmington, nc, air traffic control to…. The award is classified under NAICS 238210 — ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS and issued as a firm fixed price contract. Competition extent: competed under sap with 8 offers received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in WILMINGTON, NC. This award is one of several similar procurements from Department of Transportation under NAICS 238210 — related awards are listed below.
Contractor Information
Similar Awards
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.6M
ACEPS TYPE II PHASE 2 INSTALLATION
WELLS GLOBAL, LLC
$16.0M
CONDUCT CONSTRUCTABILITY REVIEW FOR REPLACEMENT OF (5) 15,000-GALLON ASTS, (1) 2000-GALLON AST, (1) 1000-GALLON GAS AST, (3) DTS, (2) 80KW EGS, (2) SHELTERS, (2580 FT) OF REMOTE FILL LINE, AND RECONFIGURATION OF FUEL SYSTEM AT MIDDLETON IS, AK (MDO)
SENTINEL POWER SERVICES, LLC
$12.3M
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE I
WELLS GLOBAL, LLC
$12.1M
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCC
WELLS GLOBAL, LLC
$11.7M
Stay Updated
Get notified about new opportunities matching your interests.